Footbridge over the river Tarn

• Client  Communauté d'Agglomération de l'Albigeois  • Project team  Architects  Explorations Architecture Landscape Architects  D’Ici Là Engineering  Aia Ingénierie, On  • Cost   4,6 M€ HT  • Characteristic(s)   Length 200 m - Variable width from 3 to 5 m • Programme   Construction of a cantilevered footbridge on the rail bridge, over the Tarn, in the historic heart of Albi. Requalification of public spaces.